உங்கள் கருத்துக்களை இங்கே

இன்றைய செய்திகள்:

கடலூர் மாவட்ட செய்திகள்




வியாழன், டிசம்பர் 23, 2010

Rs. 7 crore for temporary repair works to roads

CUDDALORE: 

          Breaches in drainage channels, tanks and lakes, and, damaged roads in the flood-hit Cuddalore district will be set right within 45 days, according to Collector P. Seetharaman.

In a statement released here on Wednesday, he said that a sum of Rs. 1.5 crore had been allocated for repairing the roads in the municipalities as follows: 

Cuddalore, Rs 70 lakh; 
Chidambaram, Rs. 40 lakh; 
Vriddhachalam, Rs. 25 lakh; 
and Panruti, Rs. 15 lakh.

              The Highways Department had earmarked a sum of Rs. 7 crore for carrying out temporary repair works to the roads. For strengthening the water sources, a sum of Rs. 4.32 crore had been sanctioned to the Water Resources Division of the Public Works Department, for securing the water sources in Chidambaram and Vriddhachalam blocks.

            The Collector also directed the officials to clear pavement vegetable vendors at the uzhavar sandhai and allot them space within the sandhai. He categorically told the fish vendors in the Old Town area that they should do their business only at the specifically allotted places and not on the roadside. These measures had been taken to clear traffic bottlenecks at these two points.

0 கருத்துகள்:

நண்பர்களோடு பகிர்ந்து கொள்ள

Country wise Vistior